KPG 193 BPESD-11
KPG 193 BPESD-11 extends the KPG 193 test system with Korean transmission grid scenarios from 2024 to 2038, based on Korea’s 11th Basic Plan for Long-Term Electricity Supply and Demand (BPESD-11, 11차 전력수급기본계획). It provides yearly MATPOWER-compatible network snapshots across the full planning horizon.
Across the planning horizon:
- 61 generator additions, 49 generator retirements
- 207 AC branch additions, 7 DC line additions
- 15 years of hourly profiles (2024–2038)
Datasets and documentation
updated 2026-08-24
- Removed the 2022–2023 scenario folders; results derived from those years are not reproduced in this version — use v1.5.0 for those.
- README and network evolution GIF updated to the 2024–2038 range.
- Scope: 2024–2038 (15 years).
released 2026-08-24
- Official first release of the KPG 193 BPESD-11 dataset, based on KPG 193 v2.0 and Korea’s 11th Basic Plan.
- Yearly scenario folders for 2022–2038.
- KPG 193 BPESD-11 v1.5